Case Study Details

  • Home
  • Network Management

Client:

A large medical services association in the US, one of the biggest in the country, was dealing with the serious issues that accompany having an enormous and divided IT group. At the point when occurrences happened that elaborate issues that traversed numerous various groups’ extensions would be pushed around between groups.

 

Problem:

Each group approached their own extraordinary instruments to work with their specific space of the IT framework, with a little hybrid between groups. Along these lines, when a significant blackout occurred, various alerts went off from numerous various stages that flagged various issues. Therefore, groups were working in equal investigating with little correspondence. A portion of their investigating activities was repetitive bringing about a deficiency of time and cash.

Network Management

Solution: MQSTech merged 20 unique stages into MQSTech's single stage in under 90 days. This permitted the IT office overall to have a solitary worldwide view with each group having their very own perspectives with data that is pertinent to them. Each group actually had its own apparatuses, however, they all came from a brought together source. This made their underlying driver investigation process quicker and more straightforward. MQSTech's union exertion permitted the number of serves to be diminished from 40 to 3. It likewise permitted robotized framework detailing which was not accessible through any of their dissimilar stages. Implying that the IT division, in general, got similar alarms through the worldwide dashboard. Subsequently, the groups that made up the office had the option to convey all the more effectively and work together in a consistent way.